The Omega alumnae and undergraduate leadership have developed a solid plan to address the long-term viability of the Delta Gamma experience on the UW-Madison campus. Delta Gammas must invest in their home to meet the needs of today’s students and guarantee an enduring legacy. Renovations and upgrades will likely occur over winter break and summer break to minimize the displacement of undergraduate members during the school year. Through fundraising efforts, the expansion will include:
-
Upgraded fire alarm system
-
Replace radiators and boiler
-
Bring electrical system up to code
-
Repair roof on annex
-
Repair windows
-
Upgrade landscaping